Shower tower acid alkali waste gas treatment equipment for a variety of harmful gases such as H2S, SOX, NOX, HCI, NH3, CI2 other malodorous gases of the treatment; in the spray tower for a long time after the use of the spray tower, in order to ensure that the use of the spray tower effect, we need to spray the tower for the treatment of waste gases, then the waste gas treatment equipment spray tower should be how to carry out the cleaning it? Here to introduce you, I hope to give you a reference to help.
Exhaust gas treatment spray tower equipment cleaning method one: packing disassembly immersion cleaning method
1, in the spray tower purification tower side manually build a cleaning tank, spray tower exhaust gas purification tower will be descaling agent dissolved in the cleaning tank;
2, manually take out the filler one by one, into the cleaning tank immersion cleaning, scale is cleaned then rinse with water, dry;
3、After all the fillers are taken out cleaned, manually sweep the tower off the scale slag spoils;
4、Use bactericidal algaecide to rinse inside outside the tower body water collection tank;
5, will be cleaned packing according to the original installation to restore;
6, clean up the circulating pump filter, rust, packing skin other foreign matter clean up, check whether the filter is intact, acid mist waste gas purification tower if there is bad damage to replace the new net;
7、After all the restoration, please party A management personnel acceptance;
8, the evacuation of Party B items, clean up the site health;
Exhaust gas treatment spray tower equipment cleaning method two: exhaust gas treatment equipment spray tower small cycle cleaning method
1, manually clean the exhaust gas treatment equipment spray tower, water collection tank accumulated scale, dirt;
2, the spray tower purification tower back to the water valve is closed, the water collection tank is filled with water, with about 50 ℃ hot water will be QM safe efficient descaling agent dissolved in the tank, with a rinse pump repeatedly circulating rinse filler, until the scale, the spoils of the rinse (if the filler is used for a long period of time, caused by aging slumping, it is recommended that the filler is replaced);
3、Use bactericidal algaecide to flush the filler the tower inside outside;
4、Clean up the circulating pump filter, clean up the rust, packing skin other foreign matter, check whether the filter is intact, such as bad damaged replacement of new net;
5、After all restoration, ask Party A management personnel to accept;
6、Evacuate Party B's goods, clean up the site health.
Exhaust gas treatment spray tower equipment use precautions
1, the adjustment of circulating water: the water supply pump the spray tower to decide, when running a boiler can be opened when a boiler, when two three simultaneous operation in winter, the two pumps will be opened all the time, mud pumps should be adjusted according to the flow rate of the circulating pump, so that it can be equal.
2, the amount of dosing in the shower tower dosing pool: when running a boiler, add 2 bags of alkali, add 5 bags of quicklime, such as winter running two three, according to the corresponding times to increase the amount of medicine.
3, the spray tower sedimentation tank should be cleaned frequently, one week in summer, three days in winter.
4, gray water separator sewage, discharge once per shift, to open the sewage valve, until there is clear water discharged.
5, the above rotating parts should be frequently checked, oiling, found faults should be promptly eliminated to ensure the effect of desulfurization spray tower.
6, in the upper lower staircase dosing should pay attention to safety, to have independent security, mutual security consciousness.
Exhaust gas treatment spray tower equipment daily maintenance
1、When using, please make sure whether the gas flow, medium concentration, temperature pressure are consistent with the conditions provided by the ordered equipment, if there is any change, please communicate with our company.
2、When using, the circulating water pump should be opened for 2~3 minutes before opening the fan; when stopping, the fan should be stopped for 1~2 minutes before stopping the circulating water pump. Start the pump should pay attention to: the pump can be reversed, idle.
3, regular inspection maintenance of water pumps, valves, pipelines, nozzles, filters, etc., to ensure the normal operation of the equipment.
4, in order to ensure the normal operation of the tower equipment, there must be a person in charge of management, should always check whether the fan, pump operation is normal, whether the spray pipe the gas pipe is smooth, whether the liquid storage pool level is normal, make-up float switch is normal, whether the gas-liquid concentration is in the specified range, etc., if found problems should be resolved in a timely manner.
5, the annual regular equipment for a comprehensive inspection, to prevent problems before they occur.